North side of new house

Description: North side of new house
Data Last Updated: 2009-02-11 21:02:08.0
Name:
Type:
Comments:
Page of 2 items per page


30 pics are linked to this object.
2009-7-2 North side on new house has grass (450 kb) Edit it Updated 06-04-10 (06-04-10)
2009-4-16 I dug up about 6 feet of the drain. (395 kb) Edit it Updated 04-19-09 (04-19-09)
2009-4-13 Some grass is FINALLY coming up on the north side. (438 kb) Edit it Updated 04-19-09 (04-19-09)
2009-3-5 Little Bit likes the new dirt. (230 kb) Edit it Updated 03-07-09 (03-07-09)
2009-2-26 This is as far as I could push the dirt (241 kb) Edit it Updated 03-07-09 (03-07-09)
2009-2-26 North side all filled in. (454 kb) Edit it Updated 03-07-09 (03-07-09)
2009-2-8 Lady inspect my digging (220 kb) Edit it Updated 02-11-09 (02-11-09)
2009-2-8 West half back filled (358 kb) Edit it Updated 02-11-09 (02-11-09)
2009-2-8 Once I dug a space to pull dirt down into the tractor thing went a lot faster. (245 kb) Edit it Updated 02-11-09 (02-11-09)
2009-2-8 After 1 day I`m about a quater done. (373 kb) Edit it Updated 02-11-09 (02-11-09)
2009-2-7 I tried covering the snake back up but he did not seem to like that. (267 kb) Edit it Updated 02-11-09 (02-11-09)
2009-2-7 I almost pulled this snake out of the dirt pile while digging. (267 kb) Edit it Updated 02-11-09 (02-11-09)
2009-2-3 Drain pipe in (402 kb) Edit it Updated 02-11-09 (02-11-09)
2009-2-1 It took 4 loads of sand to cover the pipe (173 kb) Edit it Updated 02-12-09 (02-12-09)
2009-2-1 All the pipe is in place and the silt filter installed (410 kb) Edit it Updated 02-12-09 (02-12-09)
2009-2-1 Drain pipe in front of the garage (430 kb) Edit it Updated 02-12-09 (02-12-09)
2009-1-30 After 2 days there is still a lot of brush pile to go. (293 kb) Edit it Updated 02-12-09 (02-12-09)
2009-1-30 Another load of branches from the brush pile. (267 kb) Edit it Updated 02-12-09 (02-12-09)
2009-1-30 Hardly looks like I have made a dent in the pile (261 kb) Edit it Updated 02-12-09 (02-12-09)
2009-1-30 Another load of brush (226 kb) Edit it Updated 02-12-09 (02-12-09)
2009-1-30 Brush pile before pic (303 kb) Edit it Updated 02-12-09 (02-12-09)
2009-1-30 Ready to start loading branches (217 kb) Edit it Updated 02-12-09 (02-12-09)
2008-10-15 Pipe for french drain in but needs covered. (404 kb) Edit it Updated 04-19-09 (04-19-09)
2008-10-15 A little rain and I have a pond. (417 kb) Edit it Updated 04-19-09 (04-19-09)
2008-10-9 Extended patio to make it easier for Satin to get in and out. (421 kb) Edit it Updated 04-19-09 (04-19-09)
This site maintained by David Abigt